Switching to the new website cost less than 1 hour of availability
58 minutes
offline during the move to the new website
Measured: Handover report of 17 Mar 2026 (58 min 23 s)
01 / Result
58 minutes
offline during the move to the new website
Measured: Handover report of 17 Mar 2026 (58 min 23 s)
Since 16 Mar 2026
online under the existing address
Measured: Handover report of 17 Mar 2026
5 times the storage
5 GB instead of 1 GB for email, after switching to a new email provider
Measured: Handover report of 17 Mar 2026 (email set up with Zoho Mail)
Service area on the map
embedded Google Maps map on the homepage
Measured: Handover report of 17 Mar 2026, homepage section “Service area”
02 / Before and after


03 / Starting point
LadyClean previously had a website from a website builder. Maintaining it took the owner a lot of effort, and the site did not fit the business.
04 / What we did
06 / Client review
“I am very happy with the web designer's work. My website turned out really well, modern, professional and exactly as I imagined it. I would especially like to highlight the excellent advice: all my questions were answered competently, and I felt well looked after throughout the whole project. […]”
Google review as “Jenny”, March 2026View on Google (opens in a new tab)